PROJECT: La-Z-Boy – Mall of Georgia
CLIENT: Furniture Galleries of Atlanta
DATE: November 14, 2006
CONSTRUCTION CONTRACT - DESIGN BUILD
PROJECT DATA
BUILDING: 22,000 s.f.
SITE: 2.2 Acres
A new free standing retail furniture center. Designed and constructed in the Mall of Georgia overlay district.
Complete with 18,000 sq. ft. of show room floor area, Custom designed for over 50 vignettes. Complete with energy efficient lighting system.
PROJECT: Ace Hardware at Woodmont Village
CLIENT: Woodmont LLC (Lucien Kimball)
DATE: September 2004
CONSTRUCTION CONTRACT - DESIGN BUILD
PROJECT DATA
BUILDING: 20,520 SF
SITE: 1.3 Acres
Included in design was a 1,100 SF open mezzanine used for office and administrative functions.
Retail facility built in 14 weeks.
Included in design was a 1,100 SF open mezzanine used for office and administrative functions.
Retail facility built in 14 weeks.
PROJECT: Kauffman Tire @ Eagle’s Landing>
CLIENT: Kauffman Family, LLLP
September 2007
PROJECT DATA:
BUILDING: 6,690 SF
SITE: 1.05 Acres
Construction of a new free-standing Retail Automotive Service Facility in Stockbridge, Georgia.
PROJECT: Buckhead Brokers>
CLIENT: Realmark Sugarloaf, LLC
DATE: June 1999
PROJECT DATA:
BUILDING: 17,648 SF
SITE: 1.5 Acres
New office (Buckhead Brokers) with lower level office/retail (rental space) building designed with lower level (open basement) to facilitate a structure with the maximum SF on a sloped site.
PROJECT: Brannon Building>
CLIENT: Larry Brannon
DATE: April 17, 2007
PROJECT DATA:
BUILDING: 10,125 SF
SITE: 1.5 Acres
Office retail building comprised of brick face,
Pre - engineered Metal Building Construction and finished office spaces.
PROJECT: Kauffman Tire @ Kennesaw
CLIENT: JMT Reality
December 2009
PROJECT DATA:
BUILDING: 6,800 SF
SITE: 1.35 Acres
Site work includes erosion control, demolition, clearing and grading, storm drainage, sanitary sewer, domestic water, curb & gutter, concrete paving & sidewalks, asphalt paving & striping, landscaping & irrigation system.
Building Construction includes concrete slab-on-grade, masonry, structural steel & joists, cabinets, TPO membrane roof, E.I.F.S., doors & hardware, glass storefronts, Overhead doors, metal stud framing & drywall, acoustical ceilings, floor coverings, painting, toilet accessories, plumbing, HVAC, electrical & fire alarm system.
Start Date of August 2009.
![]()